SUPPLY OF WELDING, INSTALLATION OF BURIED PIPELINE, SUPPLY AND ASSEMBLY OF FLANGED VALVES, HYDROSTATIC TESTING, INTERCONNECTION WITH TIE-INS, PRE-COMMISSIONING, MECHANICAL COMMISSIONING, PAINTING OF CARBON STEEL PIPELINE

Contracting partyAISCA 
Location Monagas State, Venezuela 
Implementation Dec 2013

SUBJECT OF THE CONTRACT

Welding Supply, Installation of Buried Pipelines , Supply and Assembly of Flanged Valves , Hydrostatic Testing Interconnection with Pre- Commissioning Tie-In Carbon Steel Pipe Painting Mechanic

SCOPE EXECUTED

  • Supply of Personnel, Materials and Equipment for the Civil, Mechanical , Electrical and Instrumentation Disciplines
  • Engineering Development
  • Supply of materials