CONDITIONING (SAND BLASTING) AND PAINTING OF PIPES AND LIQUID FUEL STORAGE TANKS FOR THE DEVELOPMENT OF THE PROJECT: INCREASE IN STORAGE CAPACITY

Contracting party YPFB 
Location ORURO, BOLIVIA; EL ALTO, BOLIVIA 
Implementation SEP 2018

SUBJECT OF THE CONTRACT

Conditioning (Sand Blasting ) and Painting of Pipelines and Liquid Fuel Storage Tanks for the Development of the Project: Increase in Storage Capacity of the Plants: Senkata – La Paz and San Pedro – Oruro

SCOPE EXECUTED

  • Review , Adjustment and Development of Detailed Engineering
  • Works : Layout and leveling Topographic survey , demolition of reinforced concrete elements, and other related tasks.
  • Mechanical Works : Mechanical Integrity Inspection of all existing facilities, Dismantling of existing pipes , Manufacturing and Installation of Piping , Surface Preparation and Painting of Pipes , NDT on pipes and fittings, Supply and Installation of Valves .
  • Instrumentation Works : Inspection of existing systems associated with the process, Supply, Installation and Calibration of Pressure Gauges , Temperature Indicators, among others
  • Construction of API 650 storage tanks, geodesic dome roof type
  • Start-up, commissioning and stabilization of equipment (agitators, tanks, HDMI, among others)