| Contracting party | YPFB |
| Location | ORURO, BOLIVIA; EL ALTO, BOLIVIA |
| Implementation | SEP 2018 |
SUBJECT OF THE CONTRACT
Conditioning (Sand Blasting ) and Painting of Pipelines and Liquid Fuel Storage Tanks for the Development of the Project: Increase in Storage Capacity of the Plants: Senkata – La Paz and San Pedro – Oruro
SCOPE EXECUTED
- Review , Adjustment and Development of Detailed Engineering
- Works : Layout and leveling Topographic survey , demolition of reinforced concrete elements, and other related tasks.
- Mechanical Works : Mechanical Integrity Inspection of all existing facilities, Dismantling of existing pipes , Manufacturing and Installation of Piping , Surface Preparation and Painting of Pipes , NDT on pipes and fittings, Supply and Installation of Valves .
- Instrumentation Works : Inspection of existing systems associated with the process, Supply, Installation and Calibration of Pressure Gauges , Temperature Indicators, among others
- Construction of API 650 storage tanks, geodesic dome roof type
- Start-up, commissioning and stabilization of equipment (agitators, tanks, HDMI, among others)